Shielding Design

 

 
Schulung auf der Baustelle
Schulung auf der Baustelle
On-site testing and evaluation
Interpretation of testing results


Based on the client’s guidelines, we develop various installation options that consider aspects of structural engineering and health prevention, and also include a bill of quantities. The design guidelines follow the special requirements set out by the client or relevant standards.

 

Surveys conducted beforehand to evaluate the current exposure situation can serve as a basis for shielding requirements.

 

The Cuprotect Shielding Systems GmbH has extensive experience in the commercial sector and can assist you in creating or transforming your buildings and/or spaces into permanently and fully shielded objects.


 
© 2010-2021 Cuprotect Shielding Systems GmbH | Am Bargfeld 15 | D-22941 Bargteheide | Tel: +49(0)4532-6679
| Home | Shielding Effectiveness |
Building Shielding | Shielded Chambers/Zone Model| Certified Training |
| Special Applications | Shielding Design | Partners & Links | Contact | Imprint | Privacy Policy | E-Mail | cuprotect.eu |